Slovenia: Krsko nuclear power plant exceeds planned output in April 2025 with full operational reliability

In April 2025, the Krsko nuclear power plant, jointly owned by Slovenia and Croatia, generated 503,994 MWh of net electricity, exceeding the planned output of 500,000 MWh by 0.8 percent.

Last April, the plant underwent a full month of scheduled maintenance, which did not occur this year.

The plant operated within all technical specifications, with all safety systems fully functional. Both the availability and capacity factors reached 100 percent, and no technical issues were reported.

Scroll to Top