Green electricity in Serbia: What industrial buyers need to know about origin, verification and credibility

For industrial power buyers in Serbia, green electricity is no longer a branding add-on or a sustainability slogan. By 2025–2026, it has become a regulated, auditable, and increasingly scrutinised component of procurement strategy. Understanding what “green power” actually means in Serbia, how its origin is proven, and where the risks lie is essential not only for ESG reporting, but for compliance with European supply chains, customer audits, and long-term competitiveness.

At the centre of green electricity procurement lies a fundamental distinction that many buyers still misunderstand: the difference between physical electricity flows and environmental attributes. Electricity entering an industrial facility is indistinguishable by source. Whether it was generated by hydro, wind, coal, or gas cannot be determined at the meter. What differentiates green electricity from conventional electricity is not the physical electron, but the legal proof of origin attached to it.

In Serbia, that proof takes the form of Guarantees of Origin, commonly referred to as GoOs. A Guarantee of Origin is a standardized electronic certificate that certifies that one megawatt-hour of electricity was generated from a renewable source. The electricity itself is sold into the grid like any other electricity. The GoO is a separate, tradable instrument that carries the environmental value.

For an industrial buyer, this separation is critical. Buying green electricity does not mean that renewable power is physically delivered directly to the factory. It means that the buyer acquires the exclusive right to claim the renewable attribute of a corresponding volume of electricity.

The Serbian GoO system is administered under national regulation and aligned with European standards, allowing Serbian-origin certificates to be recognised across borders when properly issued and cancelled. In practice, GoOs are issued for renewable generation from hydro, wind, solar, and biomass plants connected to the Serbian system. Once issued, a GoO can be transferred independently of the electricity and eventually cancelled in the name of the final consumer.

For industrial buyers, cancellation is the key moment. A GoO has no value until it is cancelled. Cancellation is the act that links the certificate permanently to a specific consumer and period, preventing double counting. Without cancellation, no green claim is valid, regardless of how electricity was purchased.

This brings us to the first critical process for industrial buyers: alignment between electricity consumption and GoO volume. A buyer can only claim green electricity for the volume covered by cancelled GoOs. If a facility consumes 400 GWh per year and cancels GoOs for 250 GWh, then only that portion can be reported as renewable. Partial coverage is common and fully legitimate, but it must be disclosed accurately.

A second essential element is technology and vintage matching. GoOs specify the generation technology and the production period. Buyers increasingly face scrutiny not only on whether electricity is green, but what kind of green it is and when it was produced. A hydro GoO from an old plant may satisfy basic renewable claims, but it may not meet the expectations of customers demanding additionality or recent generation. Similarly, a GoO produced years earlier but cancelled today may raise audit questions.

By 2025, many multinational customers require GoOs to be cancelled within a defined time window relative to consumption, often within the same calendar year. This makes portfolio planning essential. Buyers must ensure that GoO supply matches consumption timing, not just annual totals.

Another critical distinction is between bundled and unbundled green power. Bundled green power means that the electricity supply contract includes GoOs as part of the price. Unbundled procurement means electricity and GoOs are purchased separately. In Serbia, unbundled structures are increasingly common because they offer flexibility and cost optimisation. Electricity can be sourced competitively at market prices, while GoOs are procured separately depending on availability and ESG requirements.

From a risk perspective, unbundled procurement places greater responsibility on the buyer. The buyer must ensure that GoOs are valid, transferred correctly, and cancelled properly. Failure at any step invalidates the green claim. Bundled contracts reduce this operational burden but often come at a higher price and with less flexibility.

For industrial buyers supplying EU markets, credibility risk has become as important as price. Auditors, customers, and lenders increasingly examine not just the existence of GoOs, but their origin, traceability, and exclusivity. Claims such as “100 % renewable electricity” must be backed by documented cancellation records, clear allocation to specific sites, and consistency with reported energy consumption.

Green electricity procurement also interacts with broader regulatory and commercial frameworks. While Guarantees of Origin support renewable claims, they do not reduce physical grid emissions at the facility level. This distinction matters for carbon accounting. GoOs affect Scope 2 emissions under the market-based method, but they do not change location-based emissions factors. Industrial buyers must therefore report both and understand the difference.

This distinction is increasingly relevant for buyers exposed to European mechanisms such as CBAM or supply-chain carbon disclosure. Customers may accept GoO-backed renewable claims for electricity consumption, but still expect transparency on actual grid intensity and decarbonisation pathways.

Another emerging issue is additionality. Traditional GoOs certify that renewable electricity was generated, but they do not necessarily prove that the buyer’s purchase caused new renewable capacity to be built. As sustainability standards tighten, some buyers go beyond GoOs and seek long-term arrangements linked to specific renewable assets. In Serbia, this is still developing, but expectations are shifting.

For now, GoOs remain the primary and legally recognised instrument for green electricity claims. However, their credibility depends entirely on process discipline. Industrial buyers must implement internal controls covering procurement, verification, cancellation, and reporting. Green power cannot be managed informally or delegated without oversight.

By 2025–2026, the strategic meaning of green electricity in Serbia has changed. It is no longer about claiming environmental virtue at the lowest cost. It is about maintaining access to European markets, satisfying customer audits, and aligning with financing conditions. Buyers who understand the mechanics of origin proof treat GoOs as compliance instruments that require the same rigor as financial hedges.

Those who do not risk more than reputational damage. They risk failed audits, rejected supplier declarations, and loss of commercial credibility. In an environment where sustainability claims are increasingly verified, green electricity procurement is no longer symbolic. It is contractual, traceable, and enforceable.

Elevated by virtu.energy